Wide angle view of London Stadium interior

London Stadium's Circular Solution

LOCATION

London Stadium

SECTOR

Event Arena

CLIENT

London Stadium

THE BRIEF

High profile, short term events – Major League Baseball (MLB) and Marvel Monster Jam, at the London Stadium required aggregate haulage and waste removal with complex logistics and sustainable end of life for the products used. With events both before and after, the delivery and removal of the products had to be timed perfectly.

Short term events like these only require products for a few days. Providing an alternative use for them after the event concludes while avoiding landfill ensures that the materials are brought into the circular economy with a second life as a Holcim product or as infill at another site.

Two Sivyer trucks passing each other in London Stadium

What we achieved in numbers

0

Tonnes of materials to landfill

10,000+

Tonnes of Material

2

Events

Solution

With tight access windows and short removal times, these projects were carried out under significant time pressure by our haulage and Waste Removal Services teams.

Inside the London Stadium with Sivyer trucks moving aggregate around
Wide angle view of London Stadium interior
Two Sivyer trucks passing each other in London Stadium
Sivyer aggregate truck in London Stadium
Dirt ramp in London Stadium
Excavators and trucks moving dirt in London Stadium

In June 2024, over 5,000 tonnes of aggregates were delivered to the London Stadium to construct the temporary baseball diamond and pitcher’s mound for the MLB matchup between the New York Mets and Philadelphia Phillies. After the weekend-long event all 5,000 tonnes were removed and transported to Holcim UK asphalt plants in Purfleet and Greenwich, where they were processed and reintegrated into the supply chain. We delivered a clear circular construction process.

In July 2024, Marvel Monster Jam required the installation of various ramps which would need to bear the weight and speed of 12,000-pound monster trucks. Holcim UK developed a specialist clay and 0-6mm soil blend, tailored for the monster truck use – ideal for traction, ramping and compaction, supplying 4,800 tonnes of this specialist blend to the event.

Sivyer aggregate truck in London Stadium
Dirt ramp in London Stadium
Excavators and trucks moving dirt in London Stadium

The material was imported over the two days prior to the event and our Waste Removal Services team took all the materials away immediately after the show, carefully restoring the venue for subsequent use the following day. Rather than treating the used soil as waste, it was delivered to a nearby RSPB habitat in Rainham, supporting environmental restoration.

Relevant Products & Services

Truck driving down a dusty road

Holcim offer waste removal (muck away) and bulk earth moving services, providing seamless, compliant, and cost-effective waste removal solutions. As an authorised waste carrier and broker, we ensure that all waste streams are either responsibly recycled or disposed of in full compliance with environmental regulations.

With our extensive fleet of tippers, grab lorries, and articulated vehicles, we handle any scale waste removal efficiently, offering flexible pricing options by load or measurement.

Workers inspecting samples with an ipad

Testex is a service that aims to offer a complete waste management solution to your assessment obligations and technical guidance requirements.

We offer rapid environmental testing, which is supported by our team of qualified specialists.

We are able to meet all your duty of care requirements in the most efficient and effective way.

Waste Removals ensured zero material from either event went to landfill and highlighted a proactive approach to resource reuse in support of the circular economy and biodiversity.

Contact us and get a quote

For more information on about the project or products used in the case study
or to find out how we can help with your next project, please get in touch.

Gradient of colour from light green to dark blue