LOCATION
M42 Motorway,
Junctions 6 Birmingham Airport
SECTOR
Infrastructure; Highways
CLIENT
Skanska, Solihull Metropolitan Borough Council, National Highways
PRODUCTS USED
CBGM via Sitebatch
THE BRIEF
A £12m scheme to relieve congestion on the M42 junction 6 and improve connectivity in and around Birmingham Airport and NEC.
This included the construction of a new junction 5a and a new 2.4km carriageway linking the motorway and the Clock Roundabout and upgrading the existing Catherine de Barnes Road.
Holcim UK was selected to provide key materials and logistical planning for this high volume supply project including technical input.
What we achieved in numbers
120,000 tonnes
Overall tonnage of materials provided
5,000 tonnes
Amount of recycled materials used
2.4 kilometres
Length of new carriageway resurfaced
challenges
Being a key part of the UK’s critical strategic road network, the scale and complexity of the scheme meant significant planning and coordination was required in order to deliver what was a complex project.
This included extensive earthworks, multiple traffic phases and a highly responsive supply chain.
The project was also subject to frequent revisions and sequencing and delivery priorities making it challenging for production planning.
Solution
A robust pavement solution was required to support the long-term demands of this essential part of the strategic road network.
Holcim worked alongside the delivery team to provide materials that met structural performance requirements while also supporting efficient large-scale construction.
A major element of the road build-up was the installation of approximately 47,000 tonnes of Cement Bound Granular Material (CBGM) across the 2.4-kilometre route.
The advantages of CBGM is that it offers a more durable and cost effective alternative to flexible solutions. It is created through a hydraulically bound mixture made up of aggregates, cement and water and is highly effective at incorporating recycled materials, such as those recovered from site.
Vitally, Holcim’s solution also supported the reuse of approximately 5,000 tonnes of site-won planings within the lower layers of the CBGM structure. Some of this material was tar-bound and was successfully processed for reincorporation into the pavement design. The use of recycled content, alongside Foamix principles and bound base innovation, helped deliver a technically strong and more sustainable construction solution.
Holcim deployed its SiteBatch solution, which is its mobile on-site mixing system. This allows for a flexible and continuous supply of materials as they can be manufactured on or close to the project site to help meet program requirements. It also reduces transport movements and mileage to and from site from off-site production facilities helping support sustainability goals.
Articulated Dump Trucks (ADTs) were used on site to move materials rather than conventional road lorries. This improved internal logistics and helped maintain a safer and continuous production cycle.
Holcim also supplied 63,000 tonnes of asphalt for the surface course.
“The M42 Junction 6 Airport Link Road project successfully delivered a major new transport link that will improve traffic flow, motorway access and connectivity to one of the UK’s most important economic zones.
“Holcim’s contribution combined technical expertise, large-scale material supply, sustainable construction methods and responsive logistics management. The delivery of 47,000 tonnes of CBGM, the reuse of 5,000 tonnes of recycled planings and the successful management of changing programme demands demonstrated Holcim’s capability to support complex infrastructure projects at scale.
“The scheme stands as a strong example of Holcim’s ability to add value beyond material supply helping contractors overcome operational challenges while delivering durable, lower-carbon transport infrastructure.”
Neil Leake
National Technical Manager
Holcim UK
Relevant Products
Related Case Studies and News
Contact us and get a quote
For more information on about the project or products used in the case study
or to find out how we can help with your next project, please get in touch.